On October 26, ECE students, faculty, and staff had the opportunity to sign a beam that will be placed in the new ECE building. Several hundred members of the ECE family showed up to add their signatures to the beam and to enjoy some hot chocolate and other refreshments. The beam chosen is one of the longest ones in the structure, and it will be visible on the east side of the construction site for some time as construction of the center portion of the building continues. It will, however, eventually be enclosed within the walls of the building.
See our gallery for photos of the event.